
There was a time when bikes were built to last, and iron was the king of the tubes, these bikes use to rule every street, race or beach esplanade. Then all the high tech came along and the bikes were put into the darkest corner of each garage. In Ferropur we restore these frames to bring them to their former glory and we fit them with the coolest brand of new parts, so you can get the old frames moving at a modern speed. Drop us an email anytime to ferropurbikes@gmail.com
Thursday, March 31, 2011
Update on 29er building process

Monday, February 7, 2011
Chapter 4: welding.
Sunday, February 6, 2011
Chapter 3: IT MUST BE STEEL! it always was...
The only way to go was to build a sturdy metal frame that would hold the tubes in place no matter what.
So that´s what we did, we got 2m of 40x60cm steel profile and a good bunch of bolts and nuts and we set to design an awesome metal rig!
Since you must be able to extract the frame after welding, the structure had to be able to be disassembled.
It can be seen in the pictures how we designed several slots that would allow us to extract the frame after it had been welded.
Keep an eye on Ferropur bikes!
Thursday, December 23, 2010
Chapter 2: Tube mitering and bulding a rig.
Next step will be to position and secure the right seatstay.
Wednesday, December 22, 2010
Building a steel 29er MTB. Chapter 1: Design


The selected tubing is Columbus Zona, which should end up making a under 2kg frame on a size 19". Next step is to miter all this tubing so they match each other! easier said than done...
Monday, September 20, 2010
Wanga reinforced
Monday, September 6, 2010
How much more can the wanga give?
